Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 87 results ...

Abu-Hijleh, S F (1991) A model for variance-based exception reporting with user-defined criteria, Unpublished PhD Thesis, , University of California, Berkeley.

Al-Bahar, J F (1988) Risk management in construction projects: A systematic analytical approach for contractors, Unpublished PhD Thesis, , University of California, Berkeley.

Al-Tubayyeb, S A (1989) Improving construction contract administration utilizing multiattribute statistical analysis on bid stage information, Unpublished PhD Thesis, , University of California, Berkeley.

Alarcon-Cardenas, L F (1992) Project performance modeling: A methodology for evaluating project execution strategies, Unpublished PhD Thesis, , University of California, Berkeley.

Alves, T d C L (2005) Buffering practices in HVAC ductwork supply chains, Unpublished PhD Thesis, , University of California, Berkeley.

Arroyo, P (2014) Exploring decision-making methods for sustainable design in commercial buildings, Unpublished PhD Thesis, , University of California, Berkeley.

Aviram Traubita, A (2009) Structural response and cost characterization of bridge construction using seismic performance enhancement strategies, Unpublished PhD Thesis, , University of California, Berkeley.

Banerjee, S (2007) Statistical, empirical and mechanistic fragility analysis of concrete bridges, Unpublished PhD Thesis, , University of California, Irvine.

Bascoul, A M (2017) Managing project structural complexity by integrating facility management in planning, designing, and execution of high-end facility upgrades, Unpublished PhD Thesis, , University of California, Berkeley.

Benne, B C (2005) Managing AEC project organizations at the edge of chaos: An analysis of AEC projects' adaptive capacity from a living systems perspective, Unpublished PhD Thesis, , University of California, Berkeley.

Blampied, N B (2018) Parametric functions for conceptual and feasibility estimating in public highway project portfolios, Unpublished PhD Thesis, , University of California, Berkeley.

Boysen, J (1982) Aggregate project model for resource allocation within multiproject construction systems, Unpublished PhD Thesis, , University of California, Berkeley.

Bruni, M (1981) Business cycles and seasonality in the Italian construction sector, Unpublished PhD Thesis, , University of California, Berkeley.

Cayer, A F (2018) Design and profit: Architectural practice in the age of accumulation, Unpublished PhD Thesis, , University of California, Los Angeles.

Chen, C (2015) A proactive approach for change management and control on construction projects, Unpublished PhD Thesis, , University of California, Berkeley.

Chih, Y-Y (2010) A decision-support framework for choosing a project delivery system (PDS) in a multi-project environment, Unpublished PhD Thesis, , University of California.

Cho, S K (2011) The relation between lean construction and performance in the Korean construction industry, Unpublished PhD Thesis, , University of California, Berkeley.

Choi, K (2008) A new decision-support model for innovative contracting strategies through a quantitative analysis on aspects of project performance, Unpublished PhD Thesis, , University of California, Berkeley.

Choo, H J (2003) Distributed planning and coordination to support lean construction, Unpublished PhD Thesis, , University of California, Berkeley.

Cuff, D C (1982) Negotiating architecture: a study of architects and clients in design practice, Unpublished PhD Thesis, , University of California, Berkeley.

de Leon, D E (1996) Integrating socioeconomics in the development of criteria for optimal aseismic design of r/c buildings, Unpublished PhD Thesis, , University of California, Irvine.

Derrington, P A (1981) Controlling the quality of professional performance in architectural practice, Unpublished PhD Thesis, , University of California, Berkeley.

El-Sersy, A H E (1992) An intelligent data model for schedule updating, Unpublished PhD Thesis, , University of California, Berkeley.

Elfving, J A (2003) Exploration of opportunities to reduce lead times for engineered-to-order products, Unpublished PhD Thesis, , University of California, Berkeley.

Elvin, G A (1998) A process model for integrated design and construction, Unpublished PhD Thesis, , University of California, Berkeley.

Esmaili, O (2014) Developing a rapid seismic performance based rating system in safety assessment of buildings, Unpublished PhD Thesis, , University of California, Irvine.

Feng, P P-Y (2009) Causes and effects of rework on the delivery of healthcare facilities in California, Unpublished PhD Thesis, , University of California, Berkeley.

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow, Unpublished PhD Thesis, , University of California, Berkeley.

Galanis, P (2014) Probabilistic methods to identify seismically hazardous older-type concrete frame buildings, Unpublished PhD Thesis, , University of California, Berkeley.

Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design, Unpublished PhD Thesis, , University of California, Berkeley.

Gillen, M E (1996) Nonfatal falls in construction workers: Predictors of injury severity, Unpublished PhD Thesis, , University of California, San Francisco.

Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control, Unpublished PhD Thesis, , University of California, Berkeley.

Hecht, H R (2001) Development of major transportation projects in California, Unpublished PhD Thesis, , University of California, Davis.

Hitchcock, R J (1996) Improving life-cycle information management through documentation of project objectives and design rationale, Unpublished PhD Thesis, , University of California, Berkeley.

Huang, Y (2010) Sustainable infrastructure system modeling under uncertainties and dynamics, Unpublished PhD Thesis, , University of California, Davis.

Huang, Y-L (1995) Project and policy analysis of build-operate-transfer infrastructure development, Unpublished PhD Thesis, , University of California, Berkeley.

Ibbs, C W J (1980) Risk, complex decision-making and the application of multiattribute utility analysis in the construction industry, Unpublished PhD Thesis, , University of California, Berkeley.

Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects, Unpublished PhD Thesis, , University of California, Berkeley.

Jackson, R M (1981) A right to a job: A sociological history of carpentry and printing craft labor markets in the United States, Unpublished PhD Thesis, , University of California, Berkeley.

Jones, R C, III (1991) An economic analysis of national society of professional engineers versus United States, Unpublished PhD Thesis, , University of California, Los Angeles.

Kardon, J B (2003) The standard of care of structural engineers, Unpublished PhD Thesis, , University of California, Berkeley.

Kartman, S A (1995) Reengineering construction planning systems, Unpublished PhD Thesis, , University of California, Berkeley.

Kim, Y-W (2002) The implications of a new production paradigm for project cost control, Unpublished PhD Thesis, , University of California, Berkeley.

Kobayashi, Y (2001) Three-dimensional city modeler with fuzzy multiple layers perceptron: Application of soft computing in computer-aided architectural design systems, Unpublished PhD Thesis, , University of California, Los Angeles.

Kuprenas, J A (1988) Use of influence diagrams to assess the cost and schedule impact of construction changes, Unpublished PhD Thesis, , University of California, Berkeley.

Lee, C Y-H (2010) A probabilistic approach to the life-cycle cost assessment of preventive maintenance strategies on flexible pavements, Unpublished PhD Thesis, , University of California, Davis.

Lee, E B (2000) Constructability and productivity analysis for long life pavement rehabilitation strategies (LLPRS), Unpublished PhD Thesis, , University of California, Berkeley.

Lee, H W (2012) Application of target value design to energy efficiency investments, Unpublished PhD Thesis, , University of California, Berkeley.

Lee, S (2007) Understanding and quantifying the impact of changes on construction labor productivity: Integration of productivity factors and quantification methods, Unpublished PhD Thesis, , University of California, Berkeley.

Leino, J L (2008) Community and private sector approaches to development in Kenya, Unpublished PhD Thesis, , University of California, Berkeley.

Levinson, D M (1998) On whom the toll falls: A model of network financing, Unpublished PhD Thesis, , University of California, Berkeley.

Lin, M-C (2000) Contract design of private infrastructure concessions, Unpublished PhD Thesis, , University of California, Berkeley.

Lin, S L (2021) Environmental risk and delay analysis: Lessons learned from the california high speed rail project, Unpublished PhD Thesis, , University of California, Los Angeles.

Liu, H (2013) Adaptive optimization methods in system-level bridge management, Unpublished PhD Thesis, , University of California, Berkeley.

Liu, M (2007) Work flow variability and labor productivity loss for construction projects, Unpublished PhD Thesis, , University of California, Berkeley.

Meng, S (2023) Development of a regional wind risk assessment framework for wood-frame single-family residential building stock, Unpublished PhD Thesis, , University of California, Los Angeles.

Milberg, C T (2006) Application of tolerance management to civil systems, Unpublished PhD Thesis, , University of California, Berkeley.

Minato, T (1994) A methodology for project risk control: A work package-based approach using historical cost control data, Unpublished PhD Thesis, , University of California, Berkeley.

Moaveni, B (2007) System and damage identification of civil structures, Unpublished PhD Thesis, , University of California, San Diego.

Montoya, J L (2023) Promoting equitable pathways in engineering and career technical education, Unpublished PhD Thesis, , University of California, Irvine.

Nguyen, H V (2010) Process-based cost modeling to support target value design, Unpublished PhD Thesis, , University of California, Berkeley.

Nguyen, L d (2007) The dynamics of float, logic, resource allocation, and delay timing in forensic schedule analysis and construction delay claims, Unpublished PhD Thesis, , University of California, Berkeley.

Ostovar, M (2023) Environmental and social life cycle assessment (LCA) in transport infrastructure, Unpublished PhD Thesis, , University of California, Davis.

Pace, C B (1999) A factor-based three dimensional model of the process of new technology development in the construction engineering industry, Unpublished PhD Thesis, , University of California, Berkeley.

Parrish, K D (2009) Applying a set-based design approach to reinforcing steel design, Unpublished PhD Thesis, , University of California, Berkeley.

Peri, C A (2003) Impact of media on spatial communication: From paper to collaborative virtual environments, Unpublished PhD Thesis, , University of California, Berkeley.

Pridmore, A B (2009) Development of composite renewal systems for rapid rehabilitation and construction of bridge decks, Unpublished PhD Thesis, , University of California, San Diego.

Prozzi, J A (2001) Modeling pavement performance by combining field and experimental data, Unpublished PhD Thesis, , University of California, Berkeley.

Ross, D G (1970) The construction of the railroads of Central America, Unpublished PhD Thesis, , University of California, Santa Barbara.

Santero, N J (2009) Pavements and the environment: A life-cycle assessment approach, Unpublished PhD Thesis, , University of California, Berkeley.

Shirley, C L M (2000) Firm inventory behavior and the returns from infrastructure investment, Unpublished PhD Thesis, , University of California, Berkeley.

Songer, A D (1992) Toward an improved understanding of public sector design-build planning, Unpublished PhD Thesis, , University of California, Berkeley.

Staneff, S T (1997) A decision support system for infrastructure management, Unpublished PhD Thesis, , University of California, Berkeley.

Sun, X (2016) Proposed improvements to the MCAA method for quantifying construction loss of productivity, Unpublished PhD Thesis, , University of California, Berkeley.

Tien, I (2014) Bayesian network methods for modeling and reliability assessment of infrastructure systems, Unpublished PhD Thesis, , University of California, Berkeley.

Tobolski, M J (2010) Improving the design and performance of concrete bridges in seismic regions, Unpublished PhD Thesis, , University of California, San Diego.

Tombesi, P (1997) Travels from flatland: The Walt Disney concert hall and the specialization of design knowledge in the building sector, Unpublished PhD Thesis, , University of California, Los Angeles.

Tsai, M-T (2008) Real option-based procurement for transportation services, Unpublished PhD Thesis, , University of California, Irvine.

Tsao, C C Y (2005) Use of work structuring to increase performance of project-based production systems, Unpublished PhD Thesis, , University of California, Berkeley.

Tuholski, S J (2008) Transformation, flow, and value constellations in AEC projects, Unpublished PhD Thesis, , University of California, Berkeley.

Vanichvatana, S (1993) Predicting consequential effects of construction project changes, Unpublished PhD Thesis, , University of California, Berkeley.

Vieira, P M d S (2007) Environmental assessment of office buildings, Unpublished PhD Thesis, , University of California, Berkeley.

Viljoen, P S (1981) Incentive management techniques for pavement rehabilitation construction, Unpublished PhD Thesis, , University of California, Berkeley.

Wang, K (2017) Real options models for better investment decisions in road infrastructure under demand uncertainty, Unpublished PhD Thesis, , University of California, Irvine.

Whelton, M G (2004) The development of purpose in the project definition phase of construction projects: Implications for project management, Unpublished PhD Thesis, , University of California, Berkeley.

Williams, L M (2000) Strategic decision support for project portfolio management in the public sector, Unpublished PhD Thesis, , University of California, Los Angeles.

Wong, J-M (2008) Extending performance-based design methods by applying structural engineering design patterns, Unpublished PhD Thesis, , University of California, Berkeley.